Traditional method to change railway sleeper is still use manpower. Thanks to constantly increasing manpower cost and its low working efficiency. There need a new revolutionary way appear to change. In this case our Excavator Railway Sleeper Changer has been designed.
With the prefect modification 4 directional wheel assembled on Binghui80 excavator ,it can walk stably on the track. And the right attachment with a strike-off board and clamp perfectly replace manpower to removal old and re-place new sleepers.
According to our customers’ feedback ,on average 1 minute can change at least 30 pieces sleepers. Now our sleeper changer are using in China railway constructions