How to improve the efficiency on change railway sleeper?

     Traditional method to change railway sleeper is still use manpower. Thanks to constantly increasing manpower cost and its low working efficiency. There need a new revolutionary  way appear to change.  In this case our Excavator Railway Sleeper Changer has been designed.

With the prefect modification 4 directional  wheel assembled on Binghui80 excavator ,it can walk  stably on the track.  And the right attachment with a strike-off board and clamp perfectly replace manpower to removal old  and re-place new sleepers.

    According to our customers’ feedback ,on average 1 minute can change at least 30 pieces sleepers. Now our sleeper changer are using in China railway constructions

   

Read more!